
Remove Power as the Constraint on Your AI Roadmap.
Energy storage that gets your data center online faster.
The Speed-to-Power Problem
Every Month of Delay Can Cost $100M
Interconnection queues stretch 4+ years. Data center power demand is set to double by 2026. For a 500 MW AI training facility, each month of energization delay burns up to $100M in lost capacity, and diesel won't get you there.

GWh of Grid-Scale Energy Storage Experience

Large-Scale Energy Storage Projects Globally*

Percent
Availability

GW of AI-optimized Renewables and Storage
*Deployed, contracted, or assets under management as of March 31, 2026.
Battery storage is the fastest, most flexible power capacity you can deploy on the grid — unlocking speed through interconnection flexibility, power bridging, and power‑quality support. Fluence storage solutions enables data centers to bring capacity online sooner and operate with higher reliability by:
.webp)
Unlock Faster Interconnections
Don’t let grid bottlenecks derail your project. Our flexible assets slash peak demand and provide critical grid stability, paving the way for faster, more favorable interconnection agreements.

Power Site Operations
Ensure seamless operations with dispatchable, grid-independent power, providing instantaneous backup and full black-start capabilities for ultimate resilience.
.webp)
Protect Site Performance
Improve load variability, stabilize voltage and frequency, and enhance power quality for sensitive AI workloads.
Fluence offers energy storage products that are optimized for common customer applications but can be configured for specific use cases and requirements. All Fluence products can be delivered as turnkey solutions to the customer including all associated balance of plant equipment and delivery services.
Smartstack™

Future-proof energy storage with embedded intelligence and unprecedented density
Gridstack Pro™

Our flagship solution for grid-scale energy storage with advanced control and monitoring
Gridstack™

Reliable, factory-built, and scalable energy storage for common energy market needs











BROCHURE
Accelerating the AI economy with battery storage.
Data center power demand is set to double by 2026, with hyperscale campuses scaling from 40 MW to 200 MW+ per site. Fluence pairs grid-scale battery storage with advanced controls, commercial guarantees, and operational services to deliver a flexible, resilient power solution — already trusted by Google, Meta, and Amazon-serving facilities. See the full playbook of data center use cases, from interconnection bridging to sub-second load smoothing.
Fluence OS supports grid forming, microgrids, fast frequency response, droop control, voltage support, and other critical applications.
Dedicated, service teams with operational services providing 99% availability via performance guarantees.
Non-FEOC, industry-leading security standards and options for air-gapped or on-premise logging.
50 GWh of grid scale battery storage experience executing large complex projects at grid and transmission levels.

Talk to a Fluence data center specialist about your site.